Flight

AIC2353 9 Feb 2026

AIC2353, operated by Air India, on 9 Feb 2026: Suvarnabhumi Airport (VTBS) to Chhatrapati Shivaji International (VABB), 2 legs. Scheduled and actual times are local to each airport (hover for UTC).

← 8 Feb 2026All AIC2353 flights10 Feb 2026 →

Leg 1 of 2

PlaneTrack receiver network
RouteVTBS Suvarnabhumi Airport → VABB CHHATRAPATI SHIVAJI INTERNATIONAL
StatusCompleted (receiver network)
First seen airborne15:02 +07
Last seen18:18 IST
Duration4h 46m
AircraftVT-CID
Max altitude36,050 ft
Distance tracked1,636 nm

Leg 2 of 2

PlaneTrack receiver network
RouteVTBD BANGKOK INTERNATIONAL → ?
StatusCompleted (receiver network)
First seen airborne15:25 +07
Last seen10:23Z
Duration1h 58m
Aircraft800BE5

Punctuality, last 30 days

No completed AIC2353 departures with FAA schedule times in the last 30 days.

AIC2353 flight history Full history CSV API access

Schedule, departure and arrival times from the FAA SWIM feed; aircraft, altitude and distance from the PlaneTrack receiver network. On time means a departure within 15 minutes of schedule.