Flight
AIC313 8 Feb 2026
AIC313, operated by Air India, on 8 Feb 2026, 3 legs. Scheduled and actual times are local to each airport (hover for UTC).
Leg 1 of 3estimated
PlaneTrack receiver network| Route | RKSI Incheon International Airport → ? |
| Status | Completed (receiver network) |
| First seen airborne | 12:02 KST |
| Last seen | 03:54Z |
| Duration | 0h 51m |
| Aircraft | VT-ANZ |
| Max altitude | 35,900 ft |
Leg 2 of 3
PlaneTrack receiver network| Route | RKSS GIMPO → ? |
| Status | Completed (receiver network) |
| First seen airborne | 12:19 KST |
| Last seen | 10:15Z |
| Duration | 6h 55m |
| Aircraft | 800740 |
Leg 3 of 3
PlaneTrack receiver network| Route | ? → VIDP INDIRA GANDHI INTERNATIONAL |
| Status | Completed (receiver network) |
| First seen airborne | 08:04Z |
| Last seen | 17:14 IST |
| Duration | 3h 39m |
| Aircraft | VT-ANI |
| Max altitude | 40,000 ft |
Punctuality, last 30 days
No completed AIC313 departures with FAA schedule times in the last 30 days.
Schedule, departure and arrival times from the FAA SWIM feed; aircraft, altitude and distance from the PlaneTrack receiver network. On time means a departure within 15 minutes of schedule.