Flight

KAL9575 7 Jan 2026

KAL9575, operated by Korean Air, on 7 Jan 2026: Patna (VEPT) to Indira Gandhi International (VIDP), 3 legs. Scheduled and actual times are local to each airport (hover for UTC).

← 6 Jan 2026All KAL9575 flights8 Jan 2026 →

Leg 1 of 3estimated

PlaneTrack receiver network
RouteVEPT PATNA → VIDP INDIRA GANDHI INTERNATIONAL
StatusCompleted (receiver network)
First seen airborne05:30 IST
Last seen07:10 IST
Duration1h 40m
AircraftHL8043
Max altitude34,000 ft

Leg 2 of 3

PlaneTrack receiver network
RouteVIDP INDIRA GANDHI INTERNATIONAL → LOWW SCHWECHAT
StatusCompleted (receiver network)
First seen airborne09:18 IST
Last seen13:58 CET
Duration9h 09m
AircraftHL8043
Max altitude32,000 ft
Distance tracked2,994 nm

Leg 3 of 3

PlaneTrack receiver network
RouteLOWW SCHWECHAT → LIMC MALPENSA
StatusCompleted (receiver network)
First seen airborne16:38 CET
Last seen17:52 CET
Duration1h 13m
AircraftHL8043
Max altitude30,000 ft
Distance tracked354 nm

Punctuality, last 30 days

No completed KAL9575 departures with FAA schedule times in the last 30 days.

KAL9575 flight history Full history CSV API access

Schedule, departure and arrival times from the FAA SWIM feed; aircraft, altitude and distance from the PlaneTrack receiver network. On time means a departure within 15 minutes of schedule.